Re-Engineering Compliance at Canary Wharf
High-Performance EI solution and Fire Compartmentation
Executive Summary
One of the largest private healthcare providers in the UK, required a high-integrity and Insulation fire safety intervention during the fit-out of their prestigious corporate space in Bank Street, located in London’s premier financial and lifestyle district, Canary Wharf. Adexon was commissioned to supply, install, and commission an advanced active fire curtain system within the building’s main reception area. The objective was to establish fire compartmentation capable of providing both flame integrity (E) and thermal insulation (I), protecting critical egress paths without compromising the architectural aesthetic of a high-traffic corporate lobby.
The Core Challenge and Applying Architectural Integration of Heavy Life-Safety Infrastructure
The main reception area of a premier Canary Wharf commercial asset demands a clean, open-plan architectural flow. However, fire safety regulations required a robust, dual-performance barrier capable of halting both the physical spread of fire and the invisible, destructive transmission of radiant and conductive heat. The project brief presented several critical engineering and logistical challenges:
- The Weight-to-Span Ratio: The specified structural opening spanned approximately 7,000mm in width by 2,895mm in height. To achieve full thermal insulation (EI) over this large single span, the curtain assembly required complex, layered technical textiles. This resulted in an exceptionally heavy system weight, totalling approximately half a ton (500kg).
- Zero-Disruption Logistics: Canary Wharf commercial assets operate under strict, low-impact facility guidelines. To ensure zero operational friction, zero acoustic disturbance, and unhindered access for daytime occupants, all structural staging, mechanical lifting, and commissioning works had to be executed strictly during restricted night shifts.
Engineered Solution Using FC2-EI30-D/Sa System
To meet the demanding dual-performance brief, Adexon specified and deployed its flagship FC2-EI30-D/Sa (200 Option) active fire curtain system.
- Advanced Dual-Performance Material Science: Unlike standard fire barriers that only block physical flames, the FC2-EI30 is engineered to control thermal energy transfer.
- 30-Minute Integrity & 30-Minute Insulation (EI 30): The system provides a minimum of 30 minutes of integrity (preventing the passage of flames and hot gases) alongside 30 minutes of complete thermal insulation. This insulation barrier limits the temperature rise on the unexposed side of the curtain, ensuring that occupants evacuating through the reception lobby are entirely shielded from the intense radiant heat of a localised fire.
- Comprehensive Code Certification: The system is tested and certified to EN 13241:2003+A2:2016 in conjunction with EN 16034:2014, and obtained a fire rating of 30 minutes integrity and insulation (EI) with Sa4 and S200 smoke leakage classifications when tested to EN 1634-1:2014 and EN 1634-3:2004, classified in accordance with EN 13501-2:2016.
- Precision Execution & Perimeter Sealing: To satisfy the system’s Sa (Smoke Control) rating, Adexon’s engineers focused intensely on eliminating potential air-leakage paths around the perimeter guides. The system utilises heavy-duty side guides engineered to withstand high pressure differentials, paired with precision internal seals that contain cold smoke migration, which is the leading cause of visibility loss during commercial building evacuations.
Operational Execution & Project Timeline
Operating under a tight, highly coordinated delivery window, Adexon’s site installation teams completed the complex structural mounting, electrical tracking link-up, and mechanical calibration within a strict 2-day timeline. By confining all heavy lifting of the half-ton apparatus to rapid overnight shifts, Unispace Global and Adexon handed the reception lobby back to the building management team each morning in a pristine, fully operational state.
Outcome
The final installation seamlessly bridges the gap between premium interior design and unyielding life-safety engineering. The active curtain sits completely flush within the reception ceiling void, invisible during daily business operations. Should a localised fire emergency trigger the building management system, the barrier will deploy smoothly under gravity-failsafe conditions to isolate the threat, providing the building with verified compliance, reliable smoke containment, and critical thermal insulation along their primary escape route.